Manantalie Energy board (SOGEM), Senegal
High voltage transmission line

Location

Matam-Dagana-Rosso, Sénégal, Mauritanie, Afrique

Contract Value

33 000 000. $ CA

Duration

12 months

End of the work

December 2001

Development of the Senegal river.

Conception, engineering, airborne topography, land survey, supply, fabrication, transportation and installation of 309 kilometers of high voltage electric line (225,000 volts) with optical fiber ground wire..