Hydro-Québec, La Tuque
Power plant

Location

La Tuque, Québec, Canada

Contract Value

7 000 000. $ CA

Duration

18 months

End of the work

October 2000

Construction of adjoining galleries between the powerhouse and the dam as well as the modernization of the existing powerhouse comprising 6 turbine-alternator groups for a total of 224 MW.

Cabling and hook-up of the 5 kV and 600 volts distribution switchgear from the groups to the outdoor switchyard. Control and protection, new protection and control rooms. Electricity and ventilation building services (equipments supplied by Hydro-Québec).