Jewish General Hospital, Montréal

Location

Montréal, Québec, Canada

Contract Value

5 025 000. $ CA

Duration

12 months

End of the work

January 2006

Revamping and extension of the Jewish Hospital block E. Addition of 8 floors above the 4 existing levels, new biotechnology and analysis labs and clinical facilities. Fast track construction mode inside a building in operation.

Plumbing, heating and chilled water systems.